Virginia is the world's largest data center market and a conforming Opportunity Zone state: its income tax starts from federal income, so a Virginia resident who invests a gain in a Qualified Opportunity Fund defers both the 23.8% federal tax and Virginia's 5.75% tax. The catch is geography. The 2027 zones will come from roughly 607 eligible low-income tracts, few of them in the high-income core of Northern Virginia, so Opportunity Zone data centers in Virginia are mainly a story of the I-95 corridor, Central and Southside Virginia, and power availability.

Reviewed
Reading time
13 min
Figures
4
Sources
28 cited

Key takeaways

  • Virginia conforms to the Internal Revenue Code as of December 31, 2025 (HB 29, signed February 20, 2026), a date after Public Law 119-21; published summaries of its decoupling list do not include the Opportunity Zone rules.
  • On a $10 million gain invested in 2027, a Virginia resident defers about $2.38 million of federal tax and $575,000 of Virginia tax; the 10% step-up at year five cuts the combined bill by about $295,500.
  • Virginia REALTORS reports 607 census tracts eligible for the 2027 zones, allowing roughly 152 nominations; Treasury certification of the final list is still pending.
  • Northern Virginia had 4,496.5 MW of inventory, 2,420.2 MW under construction and 0.2% vacancy in CBRE's H1 2026 report.
  • Virginia kept its data center sales and use tax exemption ($150 million and 50 jobs, or $70 million and 10 jobs in distressed localities) but added a $0.011 per kWh electricity consumption tax from July 1, 2026.
  • Dominion Energy reported about 53.8 GW of data center capacity in various stages of contracting by mid-2026, and large new loads can wait years for service, which drives siting more than tax does.

How do Opportunity Zones and data centers intersect in Virginia?

They intersect outside the traditional core: Virginia has the deepest data center demand in the country and full state tax conformity, but most Opportunity Zone capacity will sit in lower-income tracts away from Loudoun and Fairfax. An Opportunity Zone is a low-income census tract designated under IRC §1400Z-1. A Qualified Opportunity Fund (QOF) is a corporation or partnership that holds at least 90% of its assets in Opportunity Zone property, usually through a Qualified Opportunity Zone Business (QOZB) that owns and operates the real estate.2 An investor who puts an eligible capital gain into a QOF within 180 days defers tax on it for up to five years, gets a 10% basis step-up at year five (30% in a rural fund), and pays no federal tax on the QOF's appreciation after a 10-year hold.2

For data centers, that matters most to projects with large, long-lived capital budgets: powered shells, campus infrastructure, substations and the mechanical and electrical plant. The complete guide to data centers in Opportunity Zones covers the federal rules in depth. This page covers what is specific to Virginia: the 2027 map, the state tax result, the incentive stack, Dominion and PJM power, and local politics.

Which Virginia census tracts will be Opportunity Zones in 2027?

The final list is not yet certified: Virginia's governor submitted nominations from a pool that Virginia REALTORS puts at 607 eligible tracts, and Treasury is still certifying state lists. Treasury's Rev. Proc. 2026-14 lists 25,332 eligible tracts nationwide, 8,334 of them wholly rural, and each governor may nominate up to 25% of a state's eligible tracts (or 25 tracts, if greater).1 Virginia REALTORS reported in May 2026 that 607 Virginia tracts meet the new eligibility test and that the state would nominate approximately 152 new zones.3

A tract is eligible if its median family income is no more than 70% of the area median, or if its poverty rate is at least 20% and its median family income is no more than 125% of the area median.1 The Virginia Department of Housing and Community Development (DHCD) and the Virginia Economic Development Partnership (VEDP) ran the state process, surveying localities and holding webinars in April 2026 to gather priorities for the governor.4 Nominations were due within 90 days of July 1, 2026, with one 30-day extension available, and Treasury then has 30 days (extendable by 30) to certify.1

Fig. 1Virginia's path to 2027 Opportunity Zones

  1. Apr 6, 2026

    Eligible tracts published

    Rev. Proc. 2026-14 appendix

  2. April 2026

    DHCD and VEDP outreach

    Locality survey and webinars

  3. Jul 1, 2026

    Nomination window opens

    90 days, one 30-day extension

  4. Late 2026

    Treasury certification

    30 days, extendable by 30

  5. Jan 1, 2027

    New zones take effect

    Through Dec 31, 2036

Dates follow Rev. Proc. 2026-14 and Virginia's state process. Until Treasury certifies the list, treat any nominated tract as pending.1,4

Rural tracts deserve attention. A rural area is anywhere outside a city or town of more than 50,000 people and its adjacent urbanized area.5 A Qualified Rural Opportunity Fund (QROF), which holds 90% of its assets in zones made up entirely of rural area, earns a 30% basis step-up instead of 10%, and existing buildings in those zones need only 50% (not 100%) of their basis in improvements to be substantially improved.5 Much of Southside and Southwest Virginia, where land and transmission corridors exist but incomes are lower, is the natural place to look for rural tracts. See rural Opportunity Zones and how to check whether a property is in a zone.

Does Virginia tax Opportunity Zone gains?

Virginia follows the federal result: deferred gain is not in Virginia income until it is in federal income, and gain excluded after 10 years is excluded for Virginia too. Virginia's income tax starts from federal adjusted gross income. HB 29 (Chapter 7, 2026 Acts), signed February 20, 2026, fixes Virginia's conformity to the Internal Revenue Code as of December 31, 2025, after Public Law 119-21 was enacted on July 4, 2025.6 The bill decouples from specific items, including §168(n) expensing for qualified production property, §174A research expensing and the increased §179 limits, and keeps Virginia's existing exceptions such as its long-standing decoupling from bonus depreciation.6,7 None of the published summaries we reviewed lists §1400Z-2 among the exceptions, and Novogradac's conformity tracker lists Virginia as fully conforming.8

Virginia taxes capital gains as ordinary income. The top rate is 5.75% on taxable income over $17,000.9 That is consistent with our state tax treatment of Opportunity Zone investments guide, which lists only California, North Carolina, Massachusetts (personal income tax), Mississippi and New York as clear decouplers.

Fig. 2Virginia resident: tax due at year five on a $10 million gain invested in 2027

Illustrative
  • Federal and Virginia tax on $10M$2,955,000
  • 10% step-up, federal−$238,000
  • 10% step-up, Virginia−$57,500
  • Tax due at year five$2,659,500
Illustrative. Assumes a $10,000,000 long-term gain invested in a standard QOF on time, held at least five years, a 23.8% federal rate (20% plus 3.8% net investment income tax) and Virginia's 5.75% top rate, with no change in rates. Without the QOF, the same $2,955,000 would be due in 2027.
The $10 million example in numbers (illustrative)
ItemFederal (23.8%)Virginia (5.75%)Combined
Tax if the gain is not reinvested (2027)$2,380,000$575,000$2,955,000
Tax due in 2027 if invested in a QOF$0$0$0
Gain included at year five after 10% step-up$9,000,000$9,000,000
Tax due at year five$2,142,000$517,500$2,659,500
Tax on QOF appreciation after a 10-year hold$0$0$0

In a QROF the step-up is 30%, so only $7,000,000 is included at year five: $1,666,000 federal and $402,500 Virginia. The larger value is the exclusion. If the QOF interest doubles to $20 million and is sold after 10 years, about $2.96 million of combined tax on the $10 million of appreciation disappears at these rates. For the full federal mechanics, see the Opportunity Zone tax savings example.

How big is Virginia's data center market?

It is the largest in the world. Virginia's Joint Legislative Audit and Review Commission (JLARC) found that Northern Virginia holds about 13% of reported global data center operating capacity and 25% of capacity in the Americas, with roughly 80% of Virginia's industry in Loudoun, Prince William and Fairfax counties.12 JLARC expects significant new growth outside Northern Virginia, along the I-95 corridor toward Central Virginia.12

Fig. 3Virginia data center market in numbers

Northern Virginia inventory, H1 202610
4,496.5 MW
Northern Virginia under construction, H1 202611
2,420.2 MW
Northern Virginia vacancy, H1 202610
0.2%
Data center capacity in Dominion's contracting pipeline, mid-202618
53.8 GW
CBRE figures cover the Northern Virginia market at mid-2026.10,11 Dominion's figure counts capacity at several contracting stages, of which about 12 GW was under electric service agreements.18

Northern Virginia posted 467.6 MW of net absorption in the first half of 2026, the most of any primary North American market, and vacancy fell from 0.7% to 0.2%.10 On a statewide basis, Cushman & Wakefield counted 6.3 GW under construction in Virginia at the end of 2025, about a quarter of the Americas pipeline.13 Atlanta passed Northern Virginia in capacity under construction in CBRE's H1 2026 count, a sign of how power constraints are pushing growth elsewhere.11

Demand drivers are cloud and AI tenants that want to be near the region's dense fiber and interconnection ecosystem, plus a large federal and defense customer base. The constraint is no longer tenants. It is power delivery, land with the right zoning, and local approval.

What tax incentives does Virginia offer data centers, and do they stack with Opportunity Zones?

Yes, they stack: Virginia's sales and use tax exemption applies to qualifying equipment whether or not the site is in an Opportunity Zone, and the Opportunity Zone benefit applies to the investor's capital gain. The two operate on different taxpayers and different taxes.

Virginia's main data center incentive and the 2026 changes
ItemTermsSource
Sales and use tax exemptionComputer equipment and enabling software for a qualifying data center; runs through June 30, 2035VEDP14
Standard threshold$150 million of new capital investment and 50 new jobs paying at least 150% of the local prevailing average wageVEDP14
Distressed localities$70 million and 10 jobs in localities with above-average unemployment and povertyVEDP14
Performance agreementMOU with VEDP; targets met within three years or the exemption is repaidVEDP14
CostAbout $1.6 billion of forgone revenue in FY2025Data Center Dynamics15
New electricity tax$0.011 per kWh consumed by data centers from July 1, 2026, capped at $600 million per fiscal yearWilliams Mullen; Virginia Mercury16,17

The 2026 budget fight was about whether to end the exemption. Lawmakers kept it and added the electricity consumption tax instead, and the budget directs further study of data center taxation, so the exemption's future is a live question for projects that will buy equipment after 2028.16,17 JLARC found the exemption saved companies $928 million in FY2023 and that about 90% of the industry used it.12

The distressed-locality threshold is where the overlap with Opportunity Zones is strongest. A locality with above-average unemployment and poverty is also more likely to contain eligible low-income tracts, so a project there may qualify for the lower $70 million exemption threshold and Opportunity Zone equity at the same time. The electricity tax, by contrast, is an operating cost that does not change with zone status. See state data center tax incentives and Opportunity Zones and combining Opportunity Zones with other incentives.

How hard is it to get power for a data center in Virginia?

Hard, and it decides most siting outcomes. Most of the state's data center load is served by Dominion Energy Virginia inside the PJM Interconnection, the regional grid operator; Appalachian Power serves much of Southwest Virginia, and electric cooperatives serve parts of the north and center. Dominion said in 2024 that connecting new data centers above 100 MW could take one to three years longer than before, for total waits of up to seven years in Northern Virginia.21

  • Large-load rate class: the State Corporation Commission's November 25, 2025 order created a new rate class for large users with stronger financial commitments.20 Summaries describe it as covering loads above 25 MW with high load factors, with minimum payments of 85% of contracted transmission and distribution demand and 60% of generation demand, starting in 2027.19
  • Transmission costs: in August 2026 the SCC ordered Dominion to develop a tariff assigning more transmission costs to data centers and other large loads.23
  • Capacity prices: PJM's 2027/2028 capacity auction cleared at the $333.44/MW-day cap, fell 6,623 MW short of the reliability requirement, and attributed 5,100 MW of the 5,250 MW forecast peak increase to data centers.22
  • Co-location: FERC directed PJM in December 2025 to create transmission services for load co-located with generation, a route some campuses are pursuing for on-site or adjacent supply.28

For a QOZB, power timing interacts with the 31-month working capital safe harbor, which lets a business hold cash for a written development plan (up to 62 months with a second plan). Utility queue delays are not clearly the kind of governmental delay that extends that period, so a Virginia data center fund should phase equity to match energization dates, not land closings. See data center power timelines and the Opportunity Zone clock.

What should you know about siting a data center in a Virginia Opportunity Zone?

Local approval has become as important as power. Loudoun County voted 7 to 2 on March 18, 2025 to end by-right data center approvals, so new projects there need a special exception with public hearings.24 In September 2026 Loudoun's board voted to move toward a pause of up to 12 months on acting on data center and substation applications that need legislative approval while it writes new standards, and other localities are weighing similar steps.25 In Prince William County, the Court of Appeals upheld the voiding of the Digital Gateway rezoning on March 31, 2026 because of defective public notice, and the last developer abandoned the project in July 2026.26,27

Fig. 4Siting factors for a Virginia Opportunity Zone data center

  • WatchZone eligibilityFew eligible tracts in the Northern Virginia core; more along I-95, Central and Southside Virginia
  • FailGrid capacityMulti-year waits for large loads in Dominion's northern zone
  • PassFiber and latencyBest interconnection ecosystem in the country near Ashburn; thinner further south
  • WatchLocal approvalsBy-right paths narrowing; public hearings and pauses more common
  • PassState tax conformityFollows federal deferral and exclusion at 5.75%
  • WatchSales tax exemptionKept through 2035 but under active review; new electricity tax
A general read of conditions in 2026, not a site rating. Status varies sharply between Northern Virginia and the rest of the state.12,21,25

JLARC found that 55% of Fairfax County's data centers sit within 200 feet of residential zoning, compared with 24% in Loudoun, which explains much of the noise and visual pushback.12 Water is a secondary but growing issue; closed-loop and air-cooled designs reduce draw and help with approvals. Land prices fall quickly outside Northern Virginia, but fiber routes and substation capacity thin out with them. For approach and sequencing, see community engagement for Opportunity Zone data centers and data center site selection inside Opportunity Zones.

What does this mean for investors, landowners and developers?

Virginia residents get the full benefit, out-of-state investors get their own state's result, and Virginia landowners in eligible tracts hold a scarce combination of zone status and data center demand.

  • Virginia investors: gains from any source can go into a QOF anywhere in the country, and Virginia follows the federal deferral and exclusion. The state benefit is 5.75% of the gain, deferred and partly stepped up.
  • Investors elsewhere: your residence state decides state treatment. A California resident investing in a Virginia data center QOF gets the federal benefits only.
  • Landowners: a parcel in a certified tract with a credible path to transmission is the asset. Selling land to a QOZB for cash is the simplest route; contributing land in exchange for a QOF interest is treated differently from investing a cash gain and has limits, so structure it with counsel. See Opportunity Zones for landowners.
  • Developers: build the capital plan around energization, document working capital plans, and expect public hearings. See Opportunity Zones for data center developers.

OZ Data Centers sponsors funds that pair Opportunity Zone equity with power-first site selection, which in Virginia means looking past Loudoun to the tracts the 2027 map actually covers.

Common questions

Does Virginia tax Opportunity Zone gains?

Virginia follows the federal treatment. Its income tax starts from federal adjusted gross income and it conforms to the Internal Revenue Code as of December 31, 2025, so deferred gain is taxed by Virginia when it is taxed federally, and gain excluded after a 10-year hold is excluded for Virginia too.

How many Opportunity Zones will Virginia have in 2027?

Virginia REALTORS reports 607 eligible tracts and about 152 nominations under the 25% cap. The number is final only when Treasury certifies Virginia's list, which was still pending in October 2026.

Are Loudoun County data centers in Opportunity Zones?

Few are likely to be. Loudoun is a high-income county, and the 2027 eligibility test requires a tract's median family income to be no more than 70% of the area median, or a 20% poverty rate with income no more than 125% of the median. Check the specific parcel against the certified list.

Can a data center get Virginia's sales tax exemption and Opportunity Zone benefits together?

Yes. The exemption lowers the cost of qualifying equipment for the operator, and the Opportunity Zone rules defer and exclude the investor's capital gains. In distressed localities the exemption threshold drops to $70 million and 10 jobs.

What is Virginia's new data center electricity tax?

The 2026 to 2028 budget imposes a tax of $0.011 per kWh on data center electricity use from July 1, 2026, capped at $600 million per fiscal year. It applies regardless of Opportunity Zone status.

How long does it take to get grid power for a data center in Virginia?

Dominion has said waits for large new loads in Northern Virginia can reach seven years. Sites with existing transmission capacity, or outside the most congested areas, can be faster; confirm with the utility before committing Opportunity Zone capital.

Sources

Every numbered note in this guide links to the source below.

  1. 1.Internal Revenue Service, “Treasury, IRS provide guidance to States for nominating census tracts as qualified opportunity zones under the One, Big, Beautiful Bill,” 2026. irs.gov
  2. 2.U.S. Government Publishing Office (GovInfo), “26 U.S.C. 1400Z-2: Special rules for capital gains invested in opportunity zones,” n.d. govinfo.gov
  3. 3.Virginia REALTORS, “Opportunity Zones in Virginia: What Every REALTOR Should Know,” 2026. virginiarealtors.org
  4. 4.Virginia Association of Counties, “Virginia Seeks Feedback from Counties on Governor's Nomination of Opportunity Zones,” 2026. vaco.org
  5. 5.Internal Revenue Service, “Treasury, IRS provide guidance for Opportunity Zone investments in rural areas under the One, Big, Beautiful Bill,” 2025. irs.gov
  6. 6.Virginia Department of Taxation, “Tax Bulletin 26-1: Date of IRC Conformity Advanced,” 2026. tax.virginia.gov
  7. 7.EY Tax News, “Virginia changes IRC conformity, decouples from certain OBBBA provisions, makes elective pass-through entity tax permanent,” 2026. taxnews.ey.com
  8. 8.Novogradac, “State Tax Code Conformity: Personal Income,” n.d. novoco.com
  9. 9.Virginia Department of Taxation, “2025 Tax Rate Schedule and Tax Table,” 2025. tax.virginia.gov
  10. 10.CBRE, “North American data center demand continues to outpace supply despite record construction,” 2026. cbre.com
  11. 11.Data Center Frontier, “CBRE: Record Data Center Construction Fails to Ease Capacity Crunch,” 2026. datacenterfrontier.com
  12. 12.Joint Legislative Audit and Review Commission (Virginia), “Data Centers in Virginia, Report 598,” 2024. jlarc.virginia.gov
  13. 13.Cushman & Wakefield, “Americas Data Center Market Shifts to Managed Growth,” 2026. cushmanwakefield.com
  14. 14.Virginia Economic Development Partnership, “Data Center Retail Sales and Use Tax Exemption,” n.d. vedp.org
  15. 15.Data Center Dynamics, “Virginia missed more than $1.6bn in tax revenue due to data center exemptions in 2025,” 2026. datacenterdynamics.com
  16. 16.Williams Mullen, “Virginia Budget Creates New Electricity Consumption Tax for Data Centers,” 2026. williamsmullen.com
  17. 17.Virginia Mercury, “Virginia General Assembly approves Spanberger's budget amendments, ending monthslong impasse,” 2026. virginiamercury.com
  18. 18.Nasdaq, “Dominion Energy Q2 Earnings Call Highlights,” 2026. nasdaq.com
  19. 19.American Action Forum, “Virginia's New Data Center Electricity Rate Class,” 2026. americanactionforum.org
  20. 20.Southern Environmental Law Center, “Dominion customers to see rate increase, though SCC takes steps designed to ensure data centers pay fair share,” 2025. selc.org
  21. 21.Bloomberg via BNN Bloomberg, “Data centers face seven-year wait for power hookups in Virginia,” 2024. bnnbloomberg.ca
  22. 22.PJM Interconnection, “PJM Auction Procures 134,479 MW of Generation Resources,” 2025. pjm.com
  23. 23.Virginia Mercury, “SCC orders Dominion to develop tariff to assign more transmission costs to data centers,” 2026. virginiamercury.com
  24. 24.McGuireWoods, “Loudoun County Eliminates By-Right Use for Data Centers, Increasing Development Hurdles,” 2025. mcguirewoods.com
  25. 25.Virginia Mercury, “Loudoun County, other Virginia localities consider hitting the brakes on data center development,” 2026. virginiamercury.com
  26. 26.Virginia Lawyers Weekly, “Virginia Appeals Court upholds block on Prince William Digital Gateway project,” 2026. valawyersweekly.com
  27. 27.Virginia Business, “Prince William Digital Gateway data center project officially dies,” 2026. virginiabusiness.com
  28. 28.Morgan Lewis, “FERC Directs Co-Location Reforms in PJM,” 2025. morganlewis.com

Have a capital gain or a site here?

Talk to us about Opportunity Zone data centers in this state.

Tell us about your capital gain, your land or your project. We sponsor, fund and operate data centers in qualified zones.

About a minute · Confidential

Prefer email? info@ozdatacenters.com

Confidential. Submitting this form is not an offer to buy or sell securities, and our fund offerings are generally limited to accredited investors. See our Privacy Policy.

This website is for general information only. It is not an offer to sell, or a solicitation of an offer to buy, any security. Any offering will be made only through confidential offering documents, to eligible investors, where permitted by law. Opportunity Zone tax benefits depend on each investor's circumstances and on rules that can change; consult your own tax and legal advisers.

Continue reading

Up next · Guides by stateOpportunity Zone data centers in Texas →Texas nominated 605 tracts for 2027 Opportunity Zones, has no personal income tax on gains, and has paused new data center grid hookups. What it means for investors.15 min read

← Previous: Opportunity Zone data centers in North Carolina·All 100 guides